Daily Production Scheduling Form (Dec 1,2025)

2025-12-01


Inquiry & Order: All inquiries and orders for the above specifications are welcome. Custom sizes not listed can be inquired separately for feasibility and lead time.

Daily Production Scheduling Form
Date: December 1, 2023
Document No.: PS-20231201-EN
1. Production Status & Available Specifications (As of Today)
The following square pipe specifications are currently available for scheduling on the production line:
Item Specification (mm) Material Standard
01 20 x 20 ASTM A500 Gr. B
02 40 x 40 ASTM A500 Gr. B
03 30 x 50 ASTM A500 Gr. B
04 50 x 50 ASTM A500 Gr. B
05 40 x 60 ASTM A500 Gr. B
06 20 x 40 ASTM A500 Gr. B
07 30 x 30 ASTM A500 Gr. B
08 20 x 30 ASTM A500 Gr. B
09 25 x 50 ASTM A500 Gr. B
2. Production Capacity & Lead Time Commitment
Standard Lead Time: 3 working days upon order confirmation.
Scheduling Basis: Production slots are allocated based on "First-Come, First-Served" according to the official order receipt time.
Inquiry & Order: All inquiries and orders for the above specifications are welcome. Custom sizes not listed can be inquired separately for feasibility and lead time.
3. Notes for Scheduling
This schedule is based on real-time production line status and is subject to change. Please confirm availability with our sales team before placing an order.
The 3-day delivery commitment commences after final order confirmation, completion of all pre-production procedures, and receipt of cleared payment (if applicable as per terms).
For urgent orders or large quantities, please contact us directly for priority scheduling arrangements.
info@rd-steel.com

TAG:


Recent News


Special Visit by Eurasian Technical Experts to Deepen Technical Collaboration and Strategic Partnership

The expert team arrived at our company and engaged in a full day of intensive discussions and on-site exchanges with our technical and project teams. The meeting focused on core issues such as structural optimization, material compatibility, and performance enhancement of the product under complex application conditions. Based on extensive test data and simulation analyses, engineers from both sides conducted multiple rounds of in-depth discussions, gradually identified the root causes of the technical bottlenecks, and collaboratively outlined several feasible and innovative solutions.